Town of Queen Creek Municipal Well Installation Project

Queen Creek, AZ

Client

Town of Queen Creek

Brand

Geo-Logic

Market

Water

Challenge

The Town faced a critical need to replace five aging public water supply wells and install a new irrigation well, all within an area historically used for agriculture. The original wells had nitrate concentrations exceeding the maximum contaminant level (MCL), presenting a challenge to both water quality and supply reliability.

Solutions

Clear Creek Associates, a wholly owned subsidiary of GLA, managed the entire process, from well siting and preparation of technical specifications to construction oversight. We conducted detailed hydrogeologic analyses, including lithologic and geophysical logging, hydraulic conductivity testing, and aquifer testing. We designed new wells that exceeded 1,000 gallons per minute (gpm) in production capacity while ensuring that nitrate concentrations in potable wells remained below the MCL.

Results

The project successfully delivered high-performance wells, providing sustainable, clean water for the Town’s service area. By combining cutting-edge hydrogeologic analysis with careful construction oversight, we helped the Town improve its water quality and capacity for future growth.

“Ensuring a sustainable and safe water supply for a municipality is always rewarding as a hydrogeologist.”