Groundwater Studies and Development for Oakley City
Oakley City, UT
Client
Oakley City
Markets
Challenge
Oakley City needed to develop additional public water supply wells to provide clean drinking water to the community.
Solutions
Wholly owned subsidiary, Loughlin Water conducted groundwater and well siting studies and sited, designed, permitted, constructed, and sampled public water supply wells in the Weber Sandstone and Humbug Limestone aquifers to depths of 1,840 to 2,000 feet. As part of these studies, Loughlin Water conducted age-dating studies that included tritium and carbon-14.

Results
Yields of wells ranged from 600 to 2250 gallons per minute.
